How to install… (Heel set)

Edited

Follow the link below for detailed instructions on how to install the Heel set 

HEEL SET INCLUDES:

  • 2 x Heel Set (kit includes 3mm, 7mm and 11mm effective heel lift)

  • 2 x M5, 18mm Countersunk 316 marine grade stainless steel bolts

  • 2 x M5 T-Nuts (only required if installing the QRS Heel Set onto PBR shoes).

TOOLS REQUIRED:

  • Phillips Head Screwdriver.

  • Cordless drill (For installation on PBR shoes only)

INSTRUCTIONS FOR HEEL SET INSTALLATION. (BR SHOES)

The Heel Set includes 3mm, 7mm and 11mm effective heel lift which can be adjusted via separating the Heel block pieces. 

If you need to separate the Heel block by using needle nose pliers to allow the security clip to release. Re-attach with the appropriate height you require.

36a4c585fa730761a6c9f47f1ac169417b3c8ff3-1000x483.jpg 55.7KB

close

Heel Set Installation | Bont Rowing